Capability

  • Maximize integration/commissioning scope onshore with improved quality, safety and productivity
  • Work at lower elevation, good accessibility of construction equipment and manpower
  • No need and not constrained by the capacity/boom reach of floating cranes.
  • Hull is in static position during topside load-out and integration, no limitation to the tide change, no ballasting requirement and no external wave load
  • PCC can commence earlier and onshore/nearshore operation to large extent, optimized schedule
  • Early identification and resolving PL issues during onshore / near-shore commissioning
  • Split the complex module to sub-modules to open the work front.
  • Assemble the sub-modules inside the Mega Module Assembly Shop, 24/7 without being affected by weather condition.
  • Provide delivery certainty, particularly to fast track projects.
  • Requires early engagement during detailed engineering phase.